What is the installation process for a dust-free workshop? How to install efficiently and quickly??

6f03341b-d488-4b4b-b9c4-360e49a762c7.jpg

The installation process of cleanroom workshop decoration engineering is a highly specialized system engineering, which focuses on controlling parameters such as particle concentration, temperature, humidity, and pressure in the air to meet the environmental cleanliness requirements of specific production processes. The following are the key installation process points of the project:

1、 Pre planning and Design 1 Cleanliness level determination: Determine the cleanliness level (such as Class 100, Class 1000, Class 10000, etc.) according to the production process requirements, referring to ISO 14644-1 or GB 50073 standards. 2. Airflow organization design: Adopt unidirectional flow (laminar flow) or non unidirectional flow (turbulent flow) methods, and arrange the positions of the air supply and return ports reasonably. 3. Plan layout optimization: Follow the three zone principle of "clean zone buffer zone non clean zone" to avoid cross contamination. 2、 Construction of enclosure structure 1 Wall system: 50mm thick machine made rock wool color steel plate is used, and special aluminum alloy profiles are used to seal the joints. The internal and external corners are treated with circular arcs. 2. Ceiling system: Install FFU (fan filter unit) or high-efficiency air supply outlet, and the ceiling keel needs to be dust-proof treated. 3. Ground treatment: Lay 2mm thick PVC conductive floor or epoxy self leveling floor, with a resistance value controlled between 10 ^ 6-10 ^ 9 Ω. 3、 Installation of air conditioning purification system 1 Duct production: Galvanized steel plate bite connection is used, and the inner wall needs to be polished smooth without burrs. After installation, air leakage detection is required. 2. Filter installation: The primary filter (G4 level) is installed at the air conditioning unit inlet, the medium efficiency filter (F8-F9 level) is installed at the end of the air supply section, and the high-efficiency filter (H13-H14 level) is installed on the cleanroom ceiling. 3. Airflow balance debugging: Control the airflow deviation of each air outlet within ± 15% by adjusting the valve.

Copyright ©2020- Shenzhen Zhongda Environmental Technology Co., Ltd! Copyright   备案号:粤ICP备20002072号-1